Like illustrated in the following picture.
When one of the modules is removed from the parallel bus for service or if it were to remove itself due to an internal failure , the remaining UPS modules are required to immediately accept the load of the failed UPS module.
·Insertion Loss Value Another specification to consider about fiber connector is insertion loss.