The concrete core of the tower reached the top in early August 2020, making the tower structurally topped out.
The 113th floor will have a restaurant, the 114th to 117th floors will be occupied by a multi-story observation deck, which will become one of.
The construction was halted on 18 March 2020 due to the caused by the in the country, but works resumed in mid-May 2020.
The higher floors will contain 12-story hotel rooms and 5-story hotel residences.
In addition to that, the building will have 118-stories, hence the name PNB 118.
Retrieved 25 October 2020.